Pumping Capacity Upgrade for Chad

Cameroon Pipeline with Improved Gas Terminals, Compressor Stations, Cathodic Protection, Supervisory Control and Data Acquisition (SCADA) Telecommunications Monitoring System

Titel: Pumping Capacity Upgrade for Chad

Projektarbeit , 2021 , 28 Seiten , Note: 3.8

Autor:in: Yusuf Balarabe Abdullahi (Autor:in)

Ingenieurwissenschaften - Anlagenbau

Leseprobe & Details   Blick ins Buch
Zusammenfassung Leseprobe Details

This work gives a reference for the management practice that will guide the Chad-Cameroon pumping capacity upgrade project. It includes the project organization structure, techniques, roles and responsibilities associated to the management activities that will be performed. It also describes how the proposed project will be controlled.

Additionally, the report explains management activities intended to ensure that processes and procedures are defined, and their execution will be continuously monitored, corrected if necessary and implemented, based on a common standard.

The main sections of the Chad-Cameroon upgrade will be the construction of a pipeline between Komé and Dompla to boost the capacity of the Doba-Komé-Belabo-Dompla (Chad-Cameroon) pipeline, along with new and/or improved gas terminals and compressor stations together with installation of cathodic protection and a supervisory control and data acquisition (SCADA) telecommunications monitoring system.

This report provides front-end loading engineering services for the development of an existing pipeline to transport crude oil between a refinery storage facility and a barge loading facility. This upgrade will allow bidirectional flow in the pipeline and boost flow rate capacity. The Chad- Cameroon upgrade plan includes integrating pipeline and storage terminal improvements.

Leseprobe


Inhaltsverzeichnis (Table of Contents)

  • Executive summary
  • 1.0 Introduction
    • 1.1 Project Objectives
    • 1.2 Project Scope
    • 1.3 Project Deliverables
    • 1.4 Main Risks Associated To Project And Solutions
    • 1.5 Advantages And Justification Associated With Procurement Route.
      • 1.5.1 The Project Organization Structure.
      • 1.5.2 The Project Communication And Reporting Plans
        • 1.5.2.1 Communication with Authorities.
        • 1.5.2.2 Communication with Stakeholders
        • 1.5.2.3 Communications during operations phase.
    • 1.6 Project Cost Plan
      • 1.6.1 Potential Project Income And Expenditure
        • 1.6.1.1 Financial Evaluation
        • 1.6.1.2 Economic Evaluation
    • 1.7 Project Development Plan
      • 1.7.1 Gantt Chart With Descriptions Of Major Deliverables (Milestones) At Each Stage
    • 1.8 Commissioning Strategy
    • 1.9 Importance of Control
    • 1.10 Conclusions
    • 1.11 Recommendations
      • 1.11.1 For World Bank Group

    Zielsetzung und Themenschwerpunkte (Objectives and Key Themes)

    This report provides a comprehensive guide for the management of the Chad-Cameroon pumping capacity upgrade project, outlining the project organization, techniques, roles, and responsibilities. It also explains how the project will be controlled and monitored, ensuring processes and procedures are defined and implemented according to a common standard.

    • Project organization and management structure
    • Risk assessment and mitigation strategies
    • Cost planning and financial evaluation
    • Project development plan and implementation schedule
    • Commissioning and control strategies

    Zusammenfassung der Kapitel (Chapter Summaries)

    The report begins with an introduction outlining the project objectives, scope, and deliverables. It then addresses the main risks associated with the project and proposes solutions. The advantages and justification associated with the procurement route are also discussed, including the project organization structure and communication plans. The report further dives into the project cost plan, including potential income and expenditure, and financial and economic evaluation.

    Following the cost plan, the report details the project development plan, including a Gantt chart with descriptions of major deliverables at each stage. The report concludes with a discussion on commissioning strategy, the importance of control, and recommendations for the World Bank Group.

    Schlüsselwörter (Keywords)

    The main focus topics of this report include project management, risk assessment, cost planning, financial evaluation, project development, implementation schedule, commissioning strategy, and control mechanisms. This report provides a comprehensive overview of the Chad-Cameroon pumping capacity upgrade project and highlights the importance of effective management practices for successful project implementation.

Ende der Leseprobe aus 28 Seiten  - nach oben

Details

Titel
Pumping Capacity Upgrade for Chad
Untertitel
Cameroon Pipeline with Improved Gas Terminals, Compressor Stations, Cathodic Protection, Supervisory Control and Data Acquisition (SCADA) Telecommunications Monitoring System
Hochschule
Limkokwing University of Creative Technology
Note
3.8
Autor
Yusuf Balarabe Abdullahi (Autor:in)
Erscheinungsjahr
2021
Seiten
28
Katalognummer
V1157698
ISBN (eBook)
9783346560117
ISBN (Buch)
9783346560124
Sprache
Englisch
Schlagworte
Pumping capacity Upgrade Chad-Cameroon Chad Cameroon Pipeline Gas Terminals Compressor Stations Cathodic Protection Supervisory Control and Data Acquisition SCADA Telecommunications Monitoring System Oil and Gas Chad Cameroon Pipeline
Produktsicherheit
GRIN Publishing GmbH
Arbeit zitieren
Yusuf Balarabe Abdullahi (Autor:in), 2021, Pumping Capacity Upgrade for Chad, München, GRIN Verlag, https://www.hausarbeiten.de/document/1157698
Blick ins Buch
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
  • Wenn Sie diese Meldung sehen, konnt das Bild nicht geladen und dargestellt werden.
Leseprobe aus  28  Seiten
Hausarbeiten logo
  • Facebook
  • Instagram
  • TikTok
  • Shop
  • Tutorials
  • FAQ
  • Zahlung & Versand
  • Über uns
  • Contact
  • Datenschutz
  • AGB
  • Impressum